We partner with Arena Homes to deliver factory-precise, steel-framed accessory dwelling units — engineered to rent from day one, permit-pulled, and built in weeks, not years.

A Better Way to Build a Backyard Home

Through our partnership with Arena Homes, Glendale Contractor builds ADUs on a modern steel system — engineered, factory-cut, and assembled on your lot. Here's what sets them apart:

Built from steel, not wood

Cold-formed steel framing is non-combustible and dead-straight for generations — it won't rot, warp, mold, or feed termites the way wood does.

Transparent, component pricing

You see the full build broken down by component and by space — not a lowball quote that quietly balloons with change orders.

Built in weeks, not years

Wall panels are CAD-cut in a Salt Lake-area factory and assembled on site, so once your permits clear, the build itself moves fast.

Income from day one

Every plan is engineered to rent — a real second income on your property, not a depreciating tiny home.

Inside an Arena-Built ADU

Main-floor kitchen — Glendale Contractor × Arena Homes ADU

Main-floor kitchen

Open living space — Glendale Contractor × Arena Homes ADU

Open living space

Upper-level bedrooms — Glendale Contractor × Arena Homes ADU

Upper-level bedrooms

Rooftop deck — Glendale Contractor × Arena Homes ADU

Rooftop deck

The Build Standard

Every ADU is built to one locked specification — chosen for Utah's climate and built to last:

How It Works

1

Check your lot

We confirm what your city allows and whether your lot qualifies for a detached ADU.

2

Pick a plan

Choose from eight proven floor plans — or customize to fit your lot and goals.

3

Finalize with an advisor

We validate setbacks, utilities, and compliance, then finalize your build.

4

Permit & build

Licensed contractors pull permits and assemble your steel-panel ADU on site.

Typical timeline: financing 3–5 weeks · permitting 3–5 weeks · construction 6–8 weeks · finishing ~2 weeks.

Eight proven floor plans

From a 672 sq ft unit to a 2,949 sq ft main home with its own ADU.

Explore Floor Plans

Utah Just Made ADUs Easier

As of October 1, 2026, Utah law (SB 284) requires many cities to allow a detached ADU on qualifying single-family lots — no special permit hearing. See if your lot qualifies.

Read the ADU Law Guide →

Financing Your ADU

You don't have to pay for an ADU out of pocket. Most homeowners use the equity they already have — a HELOC, a cash-out refinance, or a construction loan — and let the rental income help carry the monthly payment. We offer financing assistance to help you find the right path for your situation.

ADU Questions, Answered

Who actually builds my ADU?

Glendale Contractor builds your ADU on Arena Homes' engineered steel system — proven floor plans and factory-precise panels, with local build, permitting help, and service from us.

Can I build an ADU on my lot?

As of October 1, 2026, Utah's SB 284 requires cities of 5,000+ residents to allow a detached ADU on most single-family lots of 11,000 sq ft or larger. We'll check your specific address and city rules for free.

Why steel instead of wood?

Steel framing is non-combustible, dimensionally stable, and resistant to rot, mold, warping, and termites — so your ADU stays straight and solid for generations.

How long does it take?

Because panels are factory-cut and assembled on site, the build moves in weeks once permits clear. A typical path runs roughly: financing 3–5 weeks, permitting 3–5 weeks, construction 6–8 weeks, and finishing about 2 weeks.

How do people pay for an ADU?

Most homeowners use equity they already have — a HELOC, a cash-out refinance, or a construction loan — and let the rental income help carry the payment. We offer financing assistance to find the right fit.